Portable Gantry Swim Spa Lift Bristol

Swim Spa Installation In Bristol Using Portable Gantry & Tracked Carrier

Crane Free Swim Spa InstallationWith overhead cables and a busy road restricting access, the team used a portable gantry and chain blocks as a controlled alternative to crane lifting. Tracked …

ISO Container Jacking Skating Forklift Cheltenham

20 Foot ISO Container Removal In Cheltenham

Container Removal From Inside BuildingA 20 foot ISO container was carefully removed from within an engineering unit after being installed inside the building for many years. Jacking And Skating SupportThe …

CNC Machine Unloading Hyster Forklift Radstock

CNC Machine Movement And Installation In Radstock

· 4 tonnes moved · Completed in half a day · 7 tonne Hyster forklift used Sparrows Installation Services completed a half-day machinery movement project in Radstock, unloading a new …

Hyster Forklift Moving Machinery Into Workshop Radstock

Industrial Machinery Movement & Workshop Relocation in Radstock

· 5 tonnes moved · Completed in half a day · Saturday Relocation Sparrows Installation Services completed a machinery movement project at an industrial site in Radstock, relocating equipment from …

Fläkt Woods Chiller Secured On HIAB Transport

Hospital Chiller Removal Using Jacks, Skates and HIAB Transport

· 3 Tonnes Moved · Jacked and Skated · Completed Safely in 1 Day Sparrows Installation Services completed the removal of a chiller from an underground hospital car park, using …

Sparrow Installing a generator

Installing a Back-Up Generator to Support an MRI Scanner

· Complex installation · Restricted access · Completed safely in 1 day Sparrow Installation Services were appointed to install a backup generator to support an MRI scanner inside a building …